The project may be delayed, even if the contractor is working on time
The completion time does not depend solely on the freelancer's speed of work. In many projects, the client must first provide texts, photos, access to systems, product data, legal information, brand guidelines, or decisions necessary to begin the next stage.
If the website design requires an approved information architecture, it is not possible to responsibly design all views without that decision. If the advertising campaign requires product materials, the lack of photos and descriptions blocks its preparation. If the client has not approved the previous stage, further work may lead to costly revisions.
The problem arises when the schedule shows only the contractor's deadlines and omits dependencies on the client's side. As a result, the final deadline remains unchanged, even though part of the time allocated for the work was spent waiting.
The project deadline can only be maintained if both parties carry out their tasks according to the agreed schedule.
Briefstreak
The most common materials and decisions that block the project
The phrase “I’m waiting for the materials” can be too vague. The client may not understand exactly what is missing, in what format they should provide it, and why you cannot continue working without it. That is why it is worth naming each dependency as precisely as possible.
- Texts, product descriptions, contact details, and company information.
- Photos, videos, logos, icons, and other graphic files.
- Access to the website, hosting, domain, analytics, or advertising accounts.
- Technical information needed to prepare the integration.
- Approval of mockups, the graphic design, or a previous stage.
- Comments and corrections gathered from all decision-makers.
- Selection of one of the presented options.
- Confirmation of the scope, budget, or additional costs.
- Formal details, terms and conditions, privacy policies, and legal consents.
- Information from external vendors cooperating with the client.
Not all gaps carry the same weight. Sometimes you can carry out other elements of the project and fill in the missing material later. In other cases, starting further work without the client's decision would mean doing it based on guesswork. It is worth distinguishing right away between a gap that merely makes the work more difficult and a blockage that prevents moving on to the next stage.
First, check exactly what stopped the customer
Lack of materials does not always stem from disregarding the project. The client may not know how to prepare the content, may be waiting for approval from a supervisor, may not have access to the appropriate files, or may be overloaded with other responsibilities. Sometimes the scope of the task they received is simply too large and unclear.
Instead of sending another generic reminder, try to identify the specific obstacle. The question “When will the materials be ready?” shifts all responsibility for finding a solution onto the client. A more effective message points out the missing piece, its significance, and possible next steps.
To start designing the subpages, I need an approved list of subpages and the texts for the main sections. Are you able to provide them by Wednesday? If the texts are not ready yet, we can quote their preparation separately or start with the two subpages for which you already have the materials.
Sample message
Such communication is not limited to a reminder. It helps the client understand what you need and gives them several realistic ways to solve the problem.
Don't wait until the project submission day
One of the most common mistakes is passively waiting for several days and then informing the client just before the deadline that the project will be delayed. Even if the reason is indeed on their side, a late message may look like an attempt to excuse your own delay.
The risk should be reported at the moment it starts to affect the schedule. If the materials were supposed to arrive on Monday and you still do not have them on Wednesday, do not automatically assume that you will make up for everything later. Inform the client that failing to complete their task pushes back the possibility of starting the next stage.
The materials were to be delivered by August 10. Since I have not received them yet, I cannot start laying out the catalog on the planned date. Each additional day of delay may accordingly shift the date for delivering the first version. Once I receive the complete set of files, I will confirm the nearest available date to resume work.
Sample message
Should the client's delay automatically shift the deadline?
In most projects, that is how the schedule should work, but the rule must be clearly established. It is not always enough to move the final deadline exactly by the number of days of delay. If the client delivers the materials a week later, you may already have work scheduled for someone else by then.
For example, the client was supposed to send the texts on September 1, and you planned to work on the project from September 2 to 6. The materials arrive only on September 8, but on September 9 you start another assignment that was contracted earlier. You are not obliged to immediately abandon the next project and make up for the first client's delay.
A safer rule says that a client delay causes rescheduling according to the contractor's current availability. This protects against a situation in which several late projects suddenly come back at the same time, and each client expects immediate execution.
Delay in providing materials, information, or approval may affect the schedule. New completion deadlines will be set after receiving a complete set of required materials, taking into account the contractor's current availability.
Sample entry
What should I write to the customer when the first deadline has passed?
The first message should be calm and specific. At this stage, you do not need to assume bad intentions or immediately threaten to halt the project. Remind them what is missing, set a new deadline, and describe the direct consequence.
Hi, according to the schedule I was supposed to receive the texts for the homepage and the offer subpage by yesterday. I still cannot see them, so I’m sending a short reminder. To keep the current project presentation deadline, I need the complete set of materials no later than tomorrow by the end of the day. If you need more time, please let me know — then I’ll update the schedule.
First reminder
The message gives the customer the opportunity to admit that the deadline is unrealistic. At the same time, it does not suggest that you can wait indefinitely without affecting the completion date.
What should I write when the client still isn't responding?
If the first reminder does not bring results, the next message should formally indicate a change in the project status. Do not ask for the third time whether the client had time to look at your message. Explain that the work has been put on hold and you can no longer guarantee the original date.
I have not received the materials or information about the expected date for their delivery, so as of today I am suspending the project execution. The original completion date can no longer be maintained. After receiving the complete set of materials, I will check availability and send an updated schedule.
Information about the project suspension
This is neither a punishment nor an emotional reaction. It is a clarification of the situation: the project does not remain active in your calendar when you cannot carry out the planned work.
When should the project be put on hold?
Not every one-day delay requires a formal suspension of cooperation. The decision should depend on the scale of the project, the importance of the missing materials, and the impact of the delay on other commitments.
- Without materials, you cannot do any meaningful work.
- The client is not responding despite the reminder.
- It is not known when the blockage will be removed.
- The original completion date has ceased to be realistic.
- Continuing to hold the reservation blocks dates for other clients.
- Starting the next stage requires formal approval.
- Working on assumptions risks making a large number of unnecessary corrections.
- The client repeatedly fails to meet the agreed deadlines.
Suspension does not have to mean the end of cooperation. The project may return to execution after the blockage is removed, but it should receive a new schedule instead of automatically returning to the back of the queue.
Don't try to save the schedule at your own expense every time
A freelancer often tries to make up for the client's delay in the evenings or on the weekend. They do this because they want to keep the promised deadline and avoid a difficult conversation. In the short term, the project may be completed on time. In the long term, however, the client learns that the deadlines for delivering materials are approximate, because exceeding them does not cause any consequences.
Such catching up also affects other projects. The time reserved for subsequent clients is used to handle the earlier order, which was supposed to have already been completed. As a result, one disorganized project can delay several subsequent ones.
You may exceptionally propose express fulfillment if you truly have that possibility. However, it should be a deliberate, additional paid service, not an obligation resulting from the client's delay.
What to do when the client wants to keep the original deadline?
After the delayed materials are delivered, the client may expect the final date to remain unchanged. Do not reply immediately that this is impossible, but also do not confirm the deadline without checking the actual scope of work.
Present the available options. You can move the deadline, reduce the scope of the first version, split the implementation into stages, or — if you have free resources — propose expedited work for an additional fee.
After receiving the materials, I can propose three solutions: the full scope with a deadline of September 25, a basic version ready by September 18 with the remaining elements completed later, or an expedited completion by September 18 for an additional fee. The original deadline is no longer possible while maintaining the full scope and standard workflow.
Sample response
Can a fee be charged for downtime?
The possibility of charging a fee depends on the agreement concluded. It should not be invented only when a problem arises. If the agreement does not provide for a fee for reserving a date, downtime, or resuming the project, unilaterally adding the cost may lead to a dispute.
In future agreements, you can specify how long you keep the reservation, when the project is paused, and whether restarting it involves an additional organizational fee. Such a provision is especially useful for larger projects that require reserving many workdays.
If the delay on the client’s side exceeds 10 business days, the contractor may suspend the project and release the reserved slot. Resumption will take place according to the contractor’s current availability. Any fee for restarting the project must result from the agreed terms of cooperation.
Example organizational rule
Contract provisions should be tailored to the type of service and applicable law. For projects of greater value, it is worth consulting a lawyer about their content.
How can delays be prevented even before the project starts?
The best time to address a materials issue is before signing the contract and starting work. Even at the briefing stage, you can check whether the client has the necessary content, who will prepare it, and who is responsible for approving subsequent stages.
- List all materials and decisions that the client must provide.
- Assign a specific deadline to each item.
- Explain in what format the files should be delivered.
- Indicate the person responsible for collecting materials on the client’s side.
- Determine who ultimately approves the subsequent stages.
- Specify the maximum time for providing feedback.
- Record how a delay affects the schedule.
- Specify the point at which the project is paused.
- Explain the rules for rescheduling deadlines.
- Do not start work that requires a complete set of materials until you receive them.
Do not start the project too early
Receiving an advance payment does not always mean that you can begin the actual work. If the client still does not have content, images, access, or an approved scope, officially starting the schedule may be premature.
It is worth separating the signing of the agreement from operational readiness. The project may be considered ready to start only after certain conditions are met: the deposit is recorded, materials are handed over, access is granted, and the scope is approved.
The completion time is counted from the day of receipt of the deposit and the complete set of materials specified in the agreement — depending on which event occurs later.
Sample wording
This rule prevents a situation in which the client pays an advance, spends a month preparing content, and then expects the project to be completed by the date agreed before the collaboration began.
Divide the materials into smaller tasks
The request “please send a complete set of materials for the website” may be difficult for the client to carry out. It is unclear where to start, what exactly a complete set means, and how much work its preparation will require.
A better solution is to break the task down into specific elements. Instead of one big task, the client receives a list: a logo in vector format, contact details, a company description, a list of services, team photos, three portfolio projects, and the data for the privacy policy.
You can also specify the sequence. Some materials will be needed before the project starts, and others only before publication. This way, the client does not have to prepare everything at once, and you can start working earlier on the elements that are not blocked.
Establish one channel for sending materials and feedback
Materials sent partly by email, messenger, via links to drives and in private messages are easy to overlook. The client may be convinced that they have passed on everything, while the contractor is still looking for missing files or does not know which version of the document is current.
At the beginning of the collaboration, establish one place where the client submits materials and approves subsequent stages. Each item should have a clear status: pending, delivered, needs completion, or approved.
It is worth summarizing important decisions in writing, even when they were made during a conversation. A brief summary reduces later disputes about who was supposed to send a specific material and what deadline was agreed upon.
How does Briefstreak help reduce client-side delays?
Many delays begin even before the project starts, when the contractor does not check whether the client actually has the materials needed for implementation. The statement "the content is almost ready" can in practice mean that preparation has not even started or that it must go through several stages of approval.
In Briefstreak, you can prepare a structured brief that gathers information about available materials, decision-makers, deadlines, budget, and project dependencies. Conditional questions let you tailor the rest of the form to the client's answers. If the client does not have the texts, you can immediately ask who should prepare them and whether they need an additional copywriting service.
Complete answers help assess project readiness before preparing the offer. The contractor can include missing elements in the scope, define the client’s responsibilities, and not reserve a fixed deadline for an implementation that is not yet ready to begin.
Simple procedure to follow when the client blocks the project
- Check exactly what materials or decisions are needed.
- Assess whether the lack blocks the entire project or only one stage.
- Remind the client of the agreed deadline.
- Explain why the material is needed.
- Provide a specific new delivery date.
- Inform how the delay will affect the schedule.
- Offer help or an alternative way to carry out the work.
- If the client still does not respond, formally suspend the project.
- Release the reserved time slot and do not block other orders.
- After receiving the materials, set a new schedule according to current availability.
- Record the new dates and obtain confirmation of them.
- After the project is completed, improve your process and the contract terms.
What not to do when a client delays the project?
- Do not pretend that the delay does not affect the final deadline.
- Do not wait to report a problem until the project handoff date.
- Do not start work based on unconfirmed assumptions.
- Do not automatically make up for everything at night and on weekends.
- Do not block calendar time indefinitely.
- Do not send emotional reminders every day.
- Do not blame the client without first clarifying the situation.
- Do not charge fees that are not предусмотрed by the contract.
- Do not promise a new deadline before checking availability.
- Do not accept disorganized feedback from multiple people separately.
Summary
When the client does not provide materials, the greatest risk is not the delay itself. The problem is the lack of clear information about what is happening with the schedule, who is responsible for the next step, and when the project can be resumed.
Do not try to maintain an unrealistic deadline at your own expense. Name the missing elements, set a specific deadline, describe the consequences, and if necessary, pause the project. After receiving the materials, set a new schedule according to your actual availability.
The most effective protection is a process established before the cooperation begins. The client's responsibilities, deadlines for delivering materials, the approval process, rules for suspending work, and the impact of delays on the schedule should be clear from the start. Thanks to this, responding to a delay does not look like a conflict, but like the application of previously accepted rules.